Manisa Soma Project

Project Info
  • Category: Ongoing Projects
  • Contracting Authority : TKİ Ege Linyitleri İşletme Müdürlüğü
  • Location : Manisa, Soma
  • Tender Date : 31.07.2017
  • Date of Contract : 18.08.2017
  • Time of Construction : 30 months
  • Construction of Investor : 60 months
  • Land Area : 105.977 m²
  • Total Construction Area : 275.000 m²
  • Project Value : 700.000.000,-TL
Project Details

Contractor Construction Work Shopping center with 20.000 m² leasable area 100 office blocks for office Multi-purpose hall with minimum 3500 m² Luxury Housing = 1600 units (2 + 1), (3 + 1), (4 + 1) in various types Construction Jobs That Will Be Made To The Administration Administrative Building: 1 7-storey building Houses: 260 units […]

More Project Details

Contractor Construction Work

  1. Shopping center with 20.000 m² leasable area
  2. 100 office blocks for office
  3. Multi-purpose hall with minimum 3500 m²
  4. Luxury Housing = 1600 units (2 + 1), (3 + 1), (4 + 1) in various types

Construction Jobs That Will Be Made To The Administration

  1. Administrative Building: 1 7-storey building
  2. Houses: 260 units of 9-storey residence (7 blocks)
  3. Local: 1 unit 2 Storey Local

 